95th Ave. over Sheep Draw

Good Condition58 years old26,000 vehicles/day

Location

StateColorado
CountyWeld
Location95th Ave/us 34
Carries95th Ave.
CrossesSheep Draw
Coordinates40.40700, -104.83219

Condition Ratings

Overall ConditionGood
Channel/Waterway8 (Very Good)
Culvert7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length22.0 ft (6.7 m)
Max Span14.1 ft (4.3 m)
Deck Width75.1 ft (22.9 m)
Deck Area153.4 sq m
Main Spans2
Year Built1968 (reconstructed 1999)

Traffic

Avg Daily Traffic26,000 (2020)
Truck Traffic5%
Lanes On Bridge2

Inspection & Ownership

Last InspectionDecember 2023
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure NumberC-17-FR

Nearby Bridges