SH 392 Ml over Greeley Canal No 2
Good Condition57 years old6,500 vehicles/day
Location
| State | Colorado |
| County | Weld |
| Location | 9.1 Mi E Of Jct SH 257 |
| Carries | SH 392 Ml |
| Crosses | Greeley Canal No 2 |
| Coordinates | 40.48094, -104.71414 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 32.2 ft (9.8 m) |
| Max Span | 29.9 ft (9.1 m) |
| Deck Width | 46.6 ft (14.2 m) |
| Deck Area | 139.2 sq m |
| Main Spans | 1 |
| Year Built | 1969 |
Traffic
| Avg Daily Traffic | 6,500 (2020) |
| Truck Traffic | 15% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | November 2023 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | C-18-AD |