Dublin BLVD over Local Drainage
Fair Condition44 years old5,933 vehicles/day
Location
| State | Colorado |
| County | El Paso |
| Location | .5 M W Academy/lemonwd RD |
| Carries | Dublin BLVD |
| Crosses | Local Drainage |
| Coordinates | 38.92448, -104.79743 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 7 (Good) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 30.2 ft (9.2 m) |
| Max Span | 14.4 ft (4.4 m) |
| Deck Width | 91.2 ft (27.8 m) |
| Deck Area | 255.8 sq m |
| Main Spans | 2 |
| Year Built | 1982 |
Traffic
| Avg Daily Traffic | 5,933 (2021) |
| Truck Traffic | 6% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | CSG-H.91-14.88 |