Springnite Drive over Main Stream
Fair Condition44 years old3,721 vehicles/day
Location
| State | Colorado |
| County | El Paso |
| Location | S. Of Dawnlite |
| Carries | Springnite Drive |
| Crosses | Main Stream |
| Coordinates | 38.78586, -104.75190 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 6 (Satisfactory) |
| Culvert | 5 (Fair) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 24.6 ft (7.5 m) |
| Max Span | 12.1 ft (3.7 m) |
| Deck Width | 46.9 ft (14.3 m) |
| Deck Area | 107.2 sq m |
| Main Spans | 2 |
| Year Built | 1982 |
Traffic
| Avg Daily Traffic | 3,721 (2021) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 324 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | CSG-K.47-05.33 |