NB Speer BLVD over Little Raven ST
Fair Condition36 years old20,687 vehicles/day
Location
| State | Colorado |
| County | Denver |
| Location | 0.25 Mi E Of Platte River |
| Carries | NB Speer BLVD |
| Crosses | Little Raven ST |
| Coordinates | 39.75332, -105.00812 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Arch - Thru |
| Total Length | 111.5 ft (34 m) |
| Max Span | 95.1 ft (29 m) |
| Deck Width | 51.8 ft (15.8 m) |
| Deck Area | 537.2 sq m |
| Main Spans | 1 |
| Year Built | 1990 |
Traffic
| Avg Daily Traffic | 20,687 (2021) |
| Truck Traffic | 5% |
| Lanes On Bridge | 4 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | October 2024 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | D-04-BOST-055 |