E Yale AVE over Highline Canal
Fair Condition62 years old16,143 vehicles/day
Location
| State | Colorado |
| County | Denver |
| Location | Yale E Of Monaco Prkwy |
| Carries | E Yale AVE |
| Crosses | Highline Canal |
| Coordinates | 39.66769, -104.91179 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 9 (Excellent) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 4 — Foundations need monitoring |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Tee Beam |
| Total Length | 45.6 ft (13.9 m) |
| Max Span | 41.0 ft (12.5 m) |
| Deck Width | 56.1 ft (17.1 m) |
| Deck Area | 237.7 sq m |
| Main Spans | 1 |
| Year Built | 1964 |
Traffic
| Avg Daily Traffic | 16,143 (2021) |
| Truck Traffic | 6% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | December 2024 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | D-10-HC-190 |