EB 56th Avenue over Pedestrian Path Under
Good Condition31 years old19,982 vehicles/day
Location
| State | Colorado |
| County | Denver |
| Location | 0.5 Mi W Of Havana ST |
| Carries | EB 56th Avenue |
| Crosses | Pedestrian Path Under |
| Coordinates | 39.79827, -104.87808 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 9 (Excellent) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Slab |
| Total Length | 102.0 ft (31.1 m) |
| Max Span | 49.9 ft (15.2 m) |
| Deck Width | 47.9 ft (14.6 m) |
| Deck Area | 454.1 sq m |
| Main Spans | 3 |
| Year Built | 1995 |
Traffic
| Avg Daily Traffic | 19,982 (2021) |
| Truck Traffic | 6% |
| Lanes On Bridge | 3 |
Inspection & Ownership
| Last Inspection | December 2024 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | D-20-MB-790 |