EB E 56th Avenue over Bike Path And Flow First
Fair Condition26 years old14,732 vehicles/day
Location
| State | Colorado |
| County | Denver |
| Location | .2 Miles West Of Tower RD |
| Carries | EB E 56th Avenue |
| Crosses | Bike Path And Flow First |
| Coordinates | 39.79834, -104.77794 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Single/Spread |
| Total Length | 80.1 ft (24.4 m) |
| Max Span | 74.8 ft (22.8 m) |
| Deck Width | 41.0 ft (12.5 m) |
| Deck Area | 305 sq m |
| Main Spans | 1 |
| Year Built | 2000 |
Traffic
| Avg Daily Traffic | 14,732 (2021) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | November 2024 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | D-25-FC-020A |