E-470 EB over Parker Road
Good Condition30 years old24,375 vehicles/day
Location
| State | Colorado |
| County | Douglas |
| Location | 5.25 Mi From I25 |
| Carries | E-470 EB |
| Crosses | Parker Road |
| Coordinates | 39.55181, -104.77619 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 267.7 ft (81.6 m) |
| Max Span | 135.5 ft (41.3 m) |
| Deck Width | 82.0 ft (25 m) |
| Deck Area | 2,040 sq m |
| Main Spans | 2 |
| Year Built | 1996 (reconstructed 2016) |
Traffic
| Avg Daily Traffic | 24,375 (2018) |
| Truck Traffic | 6% |
| Lanes On Bridge | 4 |
| Lanes Under Bridge | 8 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | Local Toll Authority |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | E-470-05.25A |