E-470 EB over Peoria Street
Fair Condition36 years old25,045 vehicles/day
Location
| State | Colorado |
| County | Douglas |
| Location | 1.71 Mi From I-25 |
| Carries | E-470 EB |
| Crosses | Peoria Street |
| Coordinates | 39.55214, -104.83944 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 203.7 ft (62.1 m) |
| Max Span | 99.4 ft (30.3 m) |
| Deck Width | 73.8 ft (22.5 m) |
| Deck Area | 1397.2 sq m |
| Main Spans | 2 |
| Year Built | 1990 (reconstructed 2004) |
Traffic
| Avg Daily Traffic | 25,045 (2018) |
| Truck Traffic | 6% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 6 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | Local Toll Authority |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | E-470-1.71A |