6th Parkway over E-470
Good Condition29 years old38,000 vehicles/day
Location
| State | Colorado |
| County | Arapahoe |
| Location | 18.91 Mi From I25 |
| Carries | 6th Parkway |
| Crosses | E-470 |
| Coordinates | 39.71938, -104.72104 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 237.9 ft (72.5 m) |
| Max Span | 112.2 ft (34.2 m) |
| Deck Width | 58.1 ft (17.7 m) |
| Deck Area | 1283.2 sq m |
| Main Spans | 2 |
| Year Built | 1997 |
Traffic
| Avg Daily Traffic | 38,000 (2018) |
| Truck Traffic | 4% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 24 months |
| Owner | Local Toll Authority |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | E-470-18.91C |