E-470 NB over Pena Boulevard

Good Condition30 years old22,748 vehicles/day

Location

StateColorado
CountyDenver
Location27.86 Mi From I25
CarriesE-470 NB
CrossesPena Boulevard
Coordinates39.83344, -104.74675

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignStringer/Multi-beam
Total Length443.9 ft (135.3 m)
Max Span150.3 ft (45.8 m)
Deck Width47.9 ft (14.6 m)
Deck Area1975.4 sq m
Main Spans3
Year Built1996

Traffic

Avg Daily Traffic22,748 (2018)
Truck Traffic6%
Lanes On Bridge3
Lanes Under Bridge8

Inspection & Ownership

Last Inspection724
Inspection FrequencyEvery 24 months
OwnerLocal Toll Authority
Historical SignificanceBridge is not eligible for the National Register
Structure NumberE-470-27.86A

Nearby Bridges