E-470 NB over Pena Boulevard
Good Condition30 years old22,748 vehicles/day
Location
| State | Colorado |
| County | Denver |
| Location | 27.86 Mi From I25 |
| Carries | E-470 NB |
| Crosses | Pena Boulevard |
| Coordinates | 39.83344, -104.74675 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 443.9 ft (135.3 m) |
| Max Span | 150.3 ft (45.8 m) |
| Deck Width | 47.9 ft (14.6 m) |
| Deck Area | 1975.4 sq m |
| Main Spans | 3 |
| Year Built | 1996 |
Traffic
| Avg Daily Traffic | 22,748 (2018) |
| Truck Traffic | 6% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 8 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 24 months |
| Owner | Local Toll Authority |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | E-470-27.86A |