112th Avenue over E-470
Fair Condition30 years old4,000 vehicles/day
Location
| State | Colorado |
| County | Adams |
| Location | 32.57 Mi From I25 |
| Carries | 112th Avenue |
| Crosses | E-470 |
| Coordinates | 39.90003, -104.76247 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 255.2 ft (77.8 m) |
| Max Span | 128.6 ft (39.2 m) |
| Deck Width | 46.6 ft (14.2 m) |
| Deck Area | 1104.8 sq m |
| Main Spans | 2 |
| Year Built | 1996 |
Traffic
| Avg Daily Traffic | 4,000 (2014) |
| Truck Traffic | 4% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 24 months |
| Owner | Private |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | E-470-32.57C |