NB I-25 Onramp over I-25 Offramp To Broadway
Fair Condition21 years old94,000 vehicles/day
Location
| State | Colorado |
| County | Denver |
| Location | I-25/Washington St. |
| Carries | NB I-25 Onramp |
| Crosses | I-25 Offramp To Broadway |
| Coordinates | 39.69521, -104.97976 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 348.4 ft (106.2 m) |
| Max Span | 92.8 ft (28.3 m) |
| Deck Width | 27.9 ft (8.5 m) |
| Deck Area | 902.7 sq m |
| Main Spans | 2 |
| Year Built | 2005 |
Traffic
| Avg Daily Traffic | 94,000 (2020) |
| Truck Traffic | 6% |
| Lanes On Bridge | 1 |
| Lanes Under Bridge | 1 |
Inspection & Ownership
| Last Inspection | 624 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | F-17-NB |