Oak Street over Larimer Co. Canal No. 2
Fair Condition39 years old522 vehicles/day
Location
| State | Colorado |
| County | Larimer |
| Location | 20 Ft W Of Bryan Avenue |
| Carries | Oak Street |
| Crosses | Larimer Co. Canal No. 2 |
| Coordinates | 40.58570, -105.10585 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Slab |
| Total Length | 25.3 ft (7.7 m) |
| Max Span | 20.3 ft (6.2 m) |
| Deck Width | 46.9 ft (14.3 m) |
| Deck Area | 110.1 sq m |
| Main Spans | 1 |
| Year Built | 1987 |
Traffic
| Avg Daily Traffic | 522 (2023) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 423 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | FCOAK-0.1-BRYN |