Redlands Parkway over Redlands 2nd Lift Canal
Fair Condition26 years old6,017 vehicles/day
Location
| State | Colorado |
| County | Mesa |
| Location | 0.5 Mi S Of HWY 340 |
| Carries | Redlands Parkway |
| Crosses | Redlands 2nd Lift Canal |
| Coordinates | 39.07355, -108.64066 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 6 (Satisfactory) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Aluminum/Wrought Iron/Cast Iron |
| Design | Culvert |
| Total Length | 30.8 ft (9.4 m) |
| Max Span | 30.8 ft (9.4 m) |
| Deck Width | 85.0 ft (25.9 m) |
| Deck Area | 243.5 sq m |
| Main Spans | 1 |
| Year Built | 2000 |
Traffic
| Avg Daily Traffic | 6,017 (2022) |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 324 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | GRJ-22.22-D.73 |