I 25 Ml Nbnd over Pine Creek

Fair Condition24 years old58,000 vehicles/day

Location

StateColorado
CountyEl Paso
Location1.4 Mi N Of Jct I-25 Bus
CarriesI 25 Ml Nbnd
CrossesPine Creek
Coordinates38.93840, -104.81254

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway8 (Very Good)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialSteel Continuous
DesignFrame
Total Length228.3 ft (69.6 m)
Max Span113.5 ft (34.6 m)
Deck Width78.7 ft (24 m)
Deck Area1670.4 sq m
Main Spans3
Year Built2002

Traffic

Avg Daily Traffic58,000 (2020)
Truck Traffic10%
Lanes On Bridge4

Inspection & Ownership

Last InspectionNovember 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure NumberI-17-GK

Nearby Bridges