SH 45 Nbnd over Up Rr

Fair Condition52 years old10,000 vehicles/day

Location

StateColorado
CountyPueblo
LocationW. Edge Of Pueblo
CarriesSH 45 Nbnd
CrossesUp Rr
Coordinates38.28149, -104.66301

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure6 (Satisfactory)
Substructure6 (Satisfactory)
Scour CriticalNot applicable

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length154.2 ft (47 m)
Max Span64.0 ft (19.5 m)
Deck Width52.5 ft (16 m)
Deck Area752 sq m
Main Spans3
Year Built1974

Traffic

Avg Daily Traffic10,000 (2020)
Truck Traffic5%
Lanes On Bridge2

Inspection & Ownership

Last Inspection522
Inspection FrequencyEvery 48 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure NumberK-18-EU

Nearby Bridges