I 25 Ml Sbnd over Steel Hollow
Good Condition20 years old17,500 vehicles/day
Location
| State | Colorado |
| County | Pueblo |
| Location | 8.2 Mi S Of El Paso-puebl |
| Carries | I 25 Ml Sbnd |
| Crosses | Steel Hollow |
| Coordinates | 38.40989, -104.61389 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 185.7 ft (56.6 m) |
| Max Span | 91.5 ft (27.9 m) |
| Deck Width | 41.0 ft (12.5 m) |
| Deck Area | 707.5 sq m |
| Main Spans | 2 |
| Year Built | 2006 |
Traffic
| Avg Daily Traffic | 17,500 (2020) |
| Truck Traffic | 10% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | K-18-HA |