County Road 30 over I 25 Ml
Fair Condition63 years old1,245 vehicles/day
Location
| State | Colorado |
| County | Pueblo |
| Location | 16.2 Mi No Of Jct SH 165 |
| Carries | County Road 30 |
| Crosses | I 25 Ml |
| Coordinates | 38.16116, -104.64382 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Tee Beam |
| Total Length | 249.0 ft (75.9 m) |
| Max Span | 57.1 ft (17.4 m) |
| Deck Width | 32.2 ft (9.8 m) |
| Deck Area | 743.8 sq m |
| Main Spans | 5 |
| Year Built | 1963 |
Traffic
| Avg Daily Traffic | 1,245 (2021) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | L-18-AZ |