County Road 85 over Harmony No. 1 Canal
Good Condition20 years old25 vehicles/day
Location
| State | Colorado |
| County | Logan |
| Location | 1.4 Mi N Of US HWY 138 |
| Carries | County Road 85 |
| Crosses | Harmony No. 1 Canal |
| Coordinates | 40.89148, -102.76734 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 8 (Very Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Tee Beam |
| Total Length | 40.0 ft (12.2 m) |
| Max Span | 36.4 ft (11.1 m) |
| Deck Width | 34.4 ft (10.5 m) |
| Deck Area | 128.1 sq m |
| Main Spans | 1 |
| Year Built | 2006 |
Traffic
| Avg Daily Traffic | 25 (2022) |
| Truck Traffic | 51% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | December 2023 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | LOG85-62.7-225A |