WB Ridgegate Parkw over Happy Canyon Creek
Good Condition7 years old17,120 vehicles/day
Location
| State | Colorado |
| County | Douglas |
| Location | 0.73 Mi E Of I25 |
| Carries | WB Ridgegate Parkw |
| Crosses | Happy Canyon Creek |
| Coordinates | 39.52217, -104.85274 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 8 (Very Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Single/Spread |
| Total Length | 141.1 ft (43 m) |
| Max Span | 134.8 ft (41.1 m) |
| Deck Width | 47.9 ft (14.6 m) |
| Deck Area | 627.8 sq m |
| Main Spans | 1 |
| Year Built | 2019 |
Traffic
| Avg Daily Traffic | 17,120 (2022) |
| Truck Traffic | 2% |
| Lanes On Bridge | 3 |
Inspection & Ownership
| Last Inspection | 125 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | LONE TREE-5 |