I 25 Nbnd over Scroggs Arroyo
Fair Condition61 years old7,500 vehicles/day
Location
| State | Colorado |
| County | Pueblo |
| Location | 2.6 Miles North Of SH 165 |
| Carries | I 25 Nbnd |
| Crosses | Scroggs Arroyo |
| Coordinates | 37.99162, -104.76545 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 7 (Good) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Tee Beam |
| Total Length | 143.0 ft (43.6 m) |
| Max Span | 55.8 ft (17 m) |
| Deck Width | 42.0 ft (12.8 m) |
| Deck Area | 558.1 sq m |
| Main Spans | 3 |
| Year Built | 1965 |
Traffic
| Avg Daily Traffic | 7,500 (2020) |
| Truck Traffic | 14% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | M-17-H |