SH 12 Ml over Primero Canyon
Good Condition48 years old520 vehicles/day
Location
| State | Colorado |
| County | Las Animas |
| Location | At Segundo |
| Carries | SH 12 Ml |
| Crosses | Primero Canyon |
| Coordinates | 37.12335, -104.72870 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 6 (Satisfactory) |
| Culvert | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 47.9 ft (14.6 m) |
| Max Span | 17.7 ft (5.4 m) |
| Deck Width | 51.8 ft (15.8 m) |
| Deck Area | 230.7 sq m |
| Main Spans | 3 |
| Year Built | 1978 |
Traffic
| Avg Daily Traffic | 520 (2020) |
| Truck Traffic | 8% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 922 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | P-18-CC |