Khe Sanh Street over Clover Ditch
Fair Condition48 years old1,000 vehicles/day
Location
| State | Colorado |
| County | El Paso |
| Location | Khe Sanh And Barkeley AVE |
| Carries | Khe Sanh Street |
| Crosses | Clover Ditch |
| Coordinates | 38.73431, -104.77490 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Slab |
| Total Length | 89.9 ft (27.4 m) |
| Max Span | 36.1 ft (11 m) |
| Deck Width | 41.7 ft (12.7 m) |
| Deck Area | 348.0 sq m |
| Main Spans | 3 |
| Year Built | 1978 |
Traffic
| Avg Daily Traffic | 1,000 (2015) |
| Truck Traffic | 10% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 823 |
| Inspection Frequency | Every 24 months |
| Owner | Army |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | P85117 |