S Pine Drive over Sulphur Gulch | Sulphur

Fair Condition23 years old6,522 vehicles/day

Location

StateColorado
CountyDouglas
Location0.1 Mi S Main Street
CarriesS Pine Drive
CrossesSulphur Gulch | Sulphur
Coordinates39.51626, -104.75856

Condition Ratings

Overall ConditionFair
Deck8 (Very Good)
Superstructure6 (Satisfactory)
Substructure9 (Excellent)
Channel/Waterway8 (Very Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignStringer/Multi-beam
Total Length196.5 ft (59.9 m)
Max Span93.8 ft (28.6 m)
Deck Width77.1 ft (23.5 m)
Deck Area1407.7 sq m
Main Spans2
Year Built2003

Traffic

Avg Daily Traffic6,522 (2021)
Truck Traffic3%
Lanes On Bridge2

Inspection & Ownership

Last Inspection225
Inspection FrequencyEvery 24 months
OwnerTown/Township Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure NumberPAR PINE-0.1

Nearby Bridges