County Road 3 over Crystal River
Fair Condition79 years old713 vehicles/day
Location
| State | Colorado |
| County | Pitkin |
| Location | E Sh133 Redstone/mp51.4 |
| Carries | County Road 3 |
| Crosses | Crystal River |
| Coordinates | 39.18086, -107.24089 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 82.7 ft (25.2 m) |
| Max Span | 38.1 ft (11.6 m) |
| Deck Width | 29.9 ft (9.1 m) |
| Deck Area | 229.3 sq m |
| Main Spans | 2 |
| Year Built | 1947 |
Traffic
| Avg Daily Traffic | 713 (2022) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 524 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Historical significance is not determined |
| Structure Number | PIT-003-00.1 |