Main Street over Lake Elizabeth
Fair Condition28 years old6,631 vehicles/day
Location
| State | Colorado |
| County | Pueblo |
| Location | 0.1 Mi NE D St/river Walk |
| Carries | Main Street |
| Crosses | Lake Elizabeth |
| Coordinates | 38.26479, -104.61125 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 9 (Excellent) |
| Superstructure | 5 (Fair) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 9 — Foundation above flood level |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 85.3 ft (26 m) |
| Max Span | 81.0 ft (24.7 m) |
| Deck Width | 80.1 ft (24.4 m) |
| Deck Area | 634.4 sq m |
| Main Spans | 1 |
| Year Built | 1998 |
Traffic
| Avg Daily Traffic | 6,631 (2021) |
| Truck Traffic | 7% |
| Lanes On Bridge | 5 |
Inspection & Ownership
| Last Inspection | December 2024 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | PUEMAIN-0.1-D |