County Road 5 over Piceance Creek

Poor Condition56 years old325 vehicles/day

Location

StateColorado
CountyRio Blanco
Location9.9 Mi S Of ST HWY 64
CarriesCounty Road 5
CrossesPiceance Creek
Coordinates39.97900, -108.25211

Condition Ratings

Overall ConditionPoor
Deck5 (Fair)
Superstructure5 (Fair)
Substructure4 (Poor)
Channel/Waterway7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length30.5 ft (9.3 m)
Max Span28.2 ft (8.6 m)
Deck Width27.9 ft (8.5 m)
Deck Area79.0 sq m
Main Spans1
Year Built1970

Traffic

Avg Daily Traffic325 (2023)
Truck Traffic53%
Lanes On Bridge2

Inspection & Ownership

Last Inspection924
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure NumberRIOB-005-31.98

Nearby Bridges