County Road 5 over Piceance Creek

Fair Condition50 years old380 vehicles/day

Location

StateColorado
CountyRio Blanco
Location1.9 Mi S Of ST HWY 64
CarriesCounty Road 5
CrossesPiceance Creek
Coordinates40.07750, -108.23600

Condition Ratings

Overall ConditionFair
Channel/Waterway6 (Satisfactory)
Culvert6 (Satisfactory)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length30.5 ft (9.3 m)
Max Span11.2 ft (3.4 m)
Deck Width56.1 ft (17.1 m)
Deck Area159.0 sq m
Main Spans3
Year Built1976

Traffic

Avg Daily Traffic380 (2023)
Truck Traffic49%
Lanes On Bridge2

Inspection & Ownership

Last Inspection924
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure NumberRIOB-005-39.99

Nearby Bridges