County Road 3 over Settlers Ditch

Fair Condition67 years old19 vehicles/day

Location

StateColorado
CountySedgwick
Location0.5 Mi N. Of US HWY 138
CarriesCounty Road 3
CrossesSettlers Ditch
Coordinates40.91261, -102.63292

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure6 (Satisfactory)
Substructure5 (Fair)
Channel/Waterway6 (Satisfactory)
Scour Critical4 — Foundations need monitoring

Physical Characteristics

MaterialWood or Timber
DesignStringer/Multi-beam
Total Length24.6 ft (7.5 m)
Max Span21.7 ft (6.6 m)
Deck Width22.6 ft (6.9 m)
Deck Area51.8 sq m
Main Spans1
Year Built1959

Traffic

Avg Daily Traffic19 (2022)
Truck Traffic56%
Lanes On Bridge2

Inspection & Ownership

Last InspectionNovember 2023
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure NumberSED3-24.1-2

Nearby Bridges