County Road U29 over Dry Creek

Fair Condition35 years old3 vehicles/day

Location

StateColorado
CountySan Miguel
Location1 Mi S Of SH 14
CarriesCounty Road U29
CrossesDry Creek
Coordinates38.06592, -108.55786

Condition Ratings

Overall ConditionFair
Channel/Waterway7 (Good)
Culvert6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length20.7 ft (6.3 m)
Max Span20.7 ft (6.3 m)
Deck Width87.9 ft (26.8 m)
Deck Area168.8 sq m
Main Spans1
Year Built1991

Traffic

Avg Daily Traffic3 (2022)
Lanes On Bridge2

Inspection & Ownership

Last Inspection624
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure NumberSMGU29-0.9-9A