County Road 5 over Cache La Poudre River
Good Condition29 years old7,692 vehicles/day
Location
| State | Colorado |
| County | Larimer |
| Location | 0.9 Mi N Of Co RD 9 |
| Carries | County Road 5 |
| Crosses | Cache La Poudre River |
| Coordinates | 40.52172, -104.98214 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 162.7 ft (49.6 m) |
| Max Span | 81.0 ft (24.7 m) |
| Deck Width | 38.4 ft (11.7 m) |
| Deck Area | 580.3 sq m |
| Main Spans | 2 |
| Year Built | 1997 |
Traffic
| Avg Daily Traffic | 7,692 (2023) |
| Truck Traffic | 15% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 423 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | TNTH5-0.9-36-A |