11th ST over Greeley No. 2 Canal
Fair Condition23 years old2,422 vehicles/day
Location
| State | Colorado |
| County | Weld |
| Location | 0.3 Mi N Of ST HWY 392 |
| Carries | 11th ST |
| Crosses | Greeley No. 2 Canal |
| Coordinates | 40.48375, -104.91800 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 5 (Fair) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Concrete |
| Design | Frame |
| Total Length | 31.8 ft (9.7 m) |
| Max Span | 30.2 ft (9.2 m) |
| Deck Width | 59.4 ft (18.1 m) |
| Deck Area | 175.6 sq m |
| Main Spans | 1 |
| Year Built | 2003 |
Traffic
| Avg Daily Traffic | 2,422 (2023) |
| Truck Traffic | 11% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 324 |
| Inspection Frequency | Every 24 months |
| Owner | Town/Township Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | WIN011.0-068.0A |