Interstate-395 over Route 85
Fair Condition68 years old22,100 vehicles/day
Location
| State | Connecticut |
| County | New London |
| Location | I-395 Exit No. 2 |
| Carries | Interstate-395 |
| Crosses | Route 85 |
| Coordinates | 41.39573, -72.16617 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 182.1 ft (55.5 m) |
| Max Span | 87.9 ft (26.8 m) |
| Deck Width | 103.7 ft (31.6 m) |
| Deck Area | 1753.8 sq m |
| Main Spans | 2 |
| Year Built | 1958 (reconstructed 2019) |
Traffic
| Avg Daily Traffic | 22,100 (2020) |
| Truck Traffic | 14% |
| Lanes On Bridge | 4 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | October 2023 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 00255 |