I-95 NB Tr 819 over SR 641
Fair Condition51 years old7,500 vehicles/day
Location
| State | Connecticut |
| County | New London |
| Location | 0.2 Mi N Of Route 32 |
| Carries | I-95 NB Tr 819 |
| Crosses | SR 641 |
| Coordinates | 41.36355, -72.10260 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 5 (Fair) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 118.8 ft (36.2 m) |
| Max Span | 112.9 ft (34.4 m) |
| Deck Width | 41.7 ft (12.7 m) |
| Deck Area | 459.7 sq m |
| Main Spans | 1 |
| Year Built | 1975 |
Traffic
| Avg Daily Traffic | 7,500 (2020) |
| Truck Traffic | 9% |
| Lanes On Bridge | 1 |
| Lanes Under Bridge | 3 |
Inspection & Ownership
| Last Inspection | 423 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 02864 |