Route 8 Northbound over Catherine ST & SB Main
Fair Condition56 years old88,000 vehicles/day
Location
| State | Connecticut |
| County | Fairfield |
| Location | 1.3 Mi N Of I-95 |
| Carries | Route 8 Northbound |
| Crosses | Catherine ST & SB Main |
| Coordinates | 41.18570, -73.19281 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 5 (Fair) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 320.9 ft (97.8 m) |
| Max Span | 116.1 ft (35.4 m) |
| Deck Width | 53.5 ft (16.3 m) |
| Deck Area | 1594.1 sq m |
| Main Spans | 3 |
| Year Built | 1970 (reconstructed 1994) |
Traffic
| Avg Daily Traffic | 88,000 (2022) |
| Truck Traffic | 6% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 7 |
Inspection & Ownership
| Last Inspection | 723 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 03547A |