Chapel Street over Prov & Worc Railroad
Fair Condition114 years old8,452 vehicles/day
Location
| State | Connecticut |
| County | New Haven |
| Location | 100ft East Of East Street |
| Carries | Chapel Street |
| Crosses | Prov & Worc Railroad |
| Coordinates | 41.30350, -72.90962 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 53.1 ft (16.2 m) |
| Max Span | 50.9 ft (15.5 m) |
| Deck Width | 49.9 ft (15.2 m) |
| Deck Area | 246.2 sq m |
| Main Spans | 1 |
| Year Built | 1912 (reconstructed 2005) |
Traffic
| Avg Daily Traffic | 8,452 (2021) |
| Truck Traffic | 4% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | October 2021 |
| Inspection Frequency | Every 24 months |
| Owner | Unknown |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 04058 |