Huntingdon Avenue over Steele Brook

Fair Condition91 years old4,100 vehicles/day

Location

StateConnecticut
CountyNew Haven
LocationTompkins ST Intersection
CarriesHuntingdon Avenue
CrossesSteele Brook
Coordinates41.57525, -73.06435

Condition Ratings

Overall ConditionFair
Superstructure6 (Satisfactory)
Substructure6 (Satisfactory)
Channel/Waterway5 (Fair)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialConcrete
DesignArch - Deck
Total Length61.0 ft (18.6 m)
Max Span26.9 ft (8.2 m)
Deck Width53.1 ft (16.2 m)
Deck Area301.3 sq m
Main Spans2
Year Built1935

Traffic

Avg Daily Traffic4,100 (2020)
Truck Traffic4%
Lanes On Bridge2

Inspection & Ownership

Last InspectionDecember 2024
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is possibly eligible (requires evaluation)
Structure Number05041

Nearby Bridges