Cd WB Roadway over I-84 Ramp J
Fair Condition42 years old16,700 vehicles/day
Location
| State | Connecticut |
| County | Hartford |
| Location | 1.2 Mi E Of 84-384 Split |
| Carries | Cd WB Roadway |
| Crosses | I-84 Ramp J |
| Coordinates | 41.77727, -72.57408 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 5 (Fair) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Box Beam - Multiple |
| Total Length | 500.0 ft (152.4 m) |
| Max Span | 230.0 ft (70.1 m) |
| Deck Width | 45.9 ft (14 m) |
| Deck Area | 2133.6 sq m |
| Main Spans | 3 |
| Year Built | 1984 |
Traffic
| Avg Daily Traffic | 16,700 (2021) |
| Truck Traffic | 14% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 1 |
Inspection & Ownership
| Last Inspection | 524 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 05845 |