Interstate-95 over Naugatuck Avenue
Good Condition10 years old88,400 vehicles/day
Location
| State | Connecticut |
| County | New Haven |
| Location | Abuts N End Of 00135 |
| Carries | Interstate-95 |
| Crosses | Naugatuck Avenue |
| Coordinates | 41.20625, -73.10442 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 93.8 ft (28.6 m) |
| Max Span | 88.6 ft (27 m) |
| Deck Width | 133.2 ft (40.6 m) |
| Deck Area | 1161.2 sq m |
| Main Spans | 1 |
| Year Built | 2016 |
Traffic
| Avg Daily Traffic | 88,400 (2020) |
| Truck Traffic | 9% |
| Lanes On Bridge | 6 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 523 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 06613 |