Pow Mia Parkway over N/s Rr & Puncheon Run
Good Condition9 years old3,782 vehicles/day
Location
| State | Delaware |
| County | Kent |
| Location | West Dover |
| Carries | Pow Mia Parkway |
| Crosses | N/s Rr & Puncheon Run |
| Coordinates | 39.14069, -75.53958 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 9 (Excellent) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 732.0 ft (223.1 m) |
| Max Span | 138.1 ft (42.1 m) |
| Deck Width | 39.4 ft (12 m) |
| Deck Area | 2677.2 sq m |
| Main Spans | 6 |
| Year Built | 2017 |
Traffic
| Avg Daily Traffic | 3,782 (2020) |
| Truck Traffic | 7% |
| Lanes On Bridge | 1 |
Inspection & Ownership
| Last Inspection | 921 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 2156S151 |