Cr-78 over Austin Relief Canal
Good Condition29 years old1,080 vehicles/day
Location
| State | Florida |
| County | Hendry |
| Location | 2 Miles East Of Cr-78a |
| Carries | Cr-78 |
| Crosses | Austin Relief Canal |
| Coordinates | 26.75337, -81.48206 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 5 (Fair) |
| Culvert | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 64.3 ft (19.6 m) |
| Max Span | 22.0 ft (6.7 m) |
| Deck Area | 133.3 sq m |
| Main Spans | 3 |
| Year Built | 1997 |
Traffic
| Avg Daily Traffic | 1,080 (2021) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 623 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 074029 |