I-75 NB (sr-93) over Cr-39 (croom Road)

Fair Condition62 years old30,250 vehicles/day

Location

StateFlorida
CountyHernando
Location3.7 Mi N Of Sr-50
CarriesI-75 NB (sr-93)
CrossesCr-39 (croom Road)
Coordinates28.57276, -82.22411

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length279.2 ft (85.1 m)
Max Span67.9 ft (20.7 m)
Deck Width61.4 ft (18.7 m)
Deck Area1591.4 sq m
Main Spans5
Year Built1964 (reconstructed 2018)

Traffic

Avg Daily Traffic30,250 (2025)
Truck Traffic27%
Lanes On Bridge3
Lanes Under Bridge2

Inspection & Ownership

Last Inspection125
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number080024

Nearby Bridges