Us-27 NB (sr 25) over Josephine Creek
Good Condition58 years old21,000 vehicles/day
Location
| State | Florida |
| County | Highlands |
| Location | 4mi South Of Sr-66 |
| Carries | Us-27 NB (sr 25) |
| Crosses | Josephine Creek |
| Coordinates | 27.37339, -81.40154 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Slab |
| Total Length | 194.9 ft (59.4 m) |
| Max Span | 15.1 ft (4.6 m) |
| Deck Width | 42.3 ft (12.9 m) |
| Deck Area | 766.3 sq m |
| Main Spans | 13 |
| Year Built | 1968 (reconstructed 2000) |
Traffic
| Avg Daily Traffic | 21,000 (2023) |
| Truck Traffic | 18% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 423 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 090004 |