I-75 (sr-93) NB over Cooper Creek
Good Condition47 years old14,000 vehicles/day
Location
| State | Florida |
| County | Manatee |
| Location | 3.5 Mi S Of Sr-70 |
| Carries | I-75 (sr-93) NB |
| Crosses | Cooper Creek |
| Coordinates | 27.39691, -82.45090 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 4 — Foundations need monitoring |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 190.0 ft (57.9 m) |
| Max Span | 47.9 ft (14.6 m) |
| Deck Width | 83.0 ft (25.3 m) |
| Deck Area | 1464.9 sq m |
| Main Spans | 4 |
| Year Built | 1979 |
Traffic
| Avg Daily Traffic | 14,000 (2023) |
| Truck Traffic | 13% |
| Lanes On Bridge | 5 |
Inspection & Ownership
| Last Inspection | 823 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 130071 |