Leeland Street S. over Point Brittany Channel
Fair Condition61 years old1,050 vehicles/day
Location
| State | Florida |
| County | Pinellas |
| Location | .2mi S Of Pinellas Bayway |
| Carries | Leeland Street S. |
| Crosses | Point Brittany Channel |
| Coordinates | 27.71461, -82.69931 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 5 (Fair) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Slab |
| Total Length | 150.6 ft (45.9 m) |
| Max Span | 30.2 ft (9.2 m) |
| Deck Width | 34.4 ft (10.5 m) |
| Deck Area | 481.9 sq m |
| Main Spans | 5 |
| Year Built | 1965 (reconstructed 2003) |
Traffic
| Avg Daily Traffic | 1,050 (2023) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 523 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 157128 |