Sr-60 WB over Peace Creek Relief

Good Condition75 years old13,000 vehicles/day

Location

StateFlorida
CountyPolk
Location4.1 Mi West Of Us-27
CarriesSr-60 WB
CrossesPeace Creek Relief
Coordinates27.90440, -81.66323

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway7 (Good)
Scour Critical3 — Scour critical

Physical Characteristics

MaterialConcrete
DesignSlab
Total Length149.9 ft (45.7 m)
Max Span15.1 ft (4.6 m)
Deck Width34.1 ft (10.4 m)
Deck Area475.3 sq m
Main Spans10
Year Built1951

Traffic

Avg Daily Traffic13,000 (2024)
Truck Traffic20%
Lanes On Bridge2

Inspection & Ownership

Last Inspection824
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number160045

Nearby Bridges