Cr-139 (powell Rd) over Tunnel B-29
Good Condition16 years old10,300 vehicles/day
Location
| State | Florida |
| County | Sumter |
| Location | 0.3 Mi. South Of Cr-44a |
| Carries | Cr-139 (powell Rd) |
| Crosses | Tunnel B-29 |
| Coordinates | 28.84567, -82.02656 |
Condition Ratings
| Overall Condition | Good |
| Culvert | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 20.0 ft (6.1 m) |
| Max Span | 20.0 ft (6.1 m) |
| Deck Area | 92.7 sq m |
| Main Spans | 1 |
| Year Built | 2010 |
Traffic
| Avg Daily Traffic | 10,300 (2024) |
| Truck Traffic | 7% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 24 months |
| Owner | Other Local Agencies |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 184084 |