I-75 SB Sr-93 over Sr-26 Newberry Road
Good Condition62 years old52,250 vehicles/day
Location
| State | Florida |
| County | Alachua |
| Location | I-75 SB Over Sr-26 |
| Carries | I-75 SB Sr-93 |
| Crosses | Sr-26 Newberry Road |
| Coordinates | 29.65965, -82.41912 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 256.9 ft (78.3 m) |
| Max Span | 66.9 ft (20.4 m) |
| Deck Width | 66.9 ft (20.4 m) |
| Deck Area | 1597.3 sq m |
| Main Spans | 4 |
| Year Built | 1964 (reconstructed 1994) |
Traffic
| Avg Daily Traffic | 52,250 (2022) |
| Truck Traffic | 31% |
| Lanes On Bridge | 4 |
| Lanes Under Bridge | 7 |
Inspection & Ownership
| Last Inspection | 723 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 260057 |